Omni Gear and Machine Corporation - Toll Free: (800) 876-7216 - Fax: (815) 723-9207

 

Parallel
Splines

METRIC PARALLEL SPLINE SHAFT CONNECTIONS
DIN 5462

The flank of each key must
be parallel to the inside
diameter d' as far as to the
point of intersection.

Details left unspecified are to be designed as appropriate

Dimensions of a spline bore profile A having the nominal dimensions 8 x 32 x 36:
Spline bore profile A 8 x 32 x 38 DIN 5462

Designation of a spline shaft profile B having the nominal dimensions 8 x 46 x 54:
Spline shaft profile B 8 x 46 x 54 DIN 5463

Nominal dimensions No. of Keys Centering d1 d2 b D3 e2 f g K r
New symbol Number of keys inside diameter outside diam. Old symbol inside diam. Outside diam. width of key
6 x 23 x 26
6 x 26 x 30
6 x 28 x 32
23 x 46 x 6
26 x 30 x 6
28 x 32 x 7
6 interior
centering
23
26
28
26
30
32
6
6
7
22.1
24.6
26.7
1.25
1.84
1.77
3.54
3.85
4.03
0.3
0.3
0.3
0.3
0.3
0.3
0.2
0.2
0.2
8 x 32 x 36
8 x 36 x 40
8 x 42 x 46
8 x 46 x 50
8 x 52 x 58
8 x 56 x 62
8 x 62 x 68
32 x 36 x 6
36 x 40 x 7
42 x 46 x 8
46 x 50 x 9
52 x 58 x 10
56 x 62 x 10
62 x 68 x 12
8 interior
of flank
centering
32
36
42
46
52
56
62
36
40
46
50
58
62
68
6
7
8
9
10
10
12
30.42
34.5
40.4
44.62
49.7
53.6
59.82
1.89
1.78
1.68
1.61
2.72
2.76
2.48
2.71
3.46
5.03
5.75
4.89
6.38
7.31
0.4
0.4
0.4
0.4
0.5
0.5
0.5
0.4
0.4
0.4
0.4
0.5
0.5
0.5
0.3
0.3
0.3
0.3
0.5
0.5
0.5
10 x 72 x 78
10 x 82 x 88
10 x 92 x 98
10 x 102 x 108
10 x 102 x 108
72 x 72 x 12
82 x 88 x 12
92 x 98 x 14
102 x 108 x 16
102 x 108 x 18
10 72
82
92
102
112
78
88
98
108
120
12
12
14
16
18
69.6
79.32
89.44
99.9
108.8
2.54
2.67
2.36
2.32
3.23
5.45
8.62
10.08
11.49
10.72
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5

1) Internal centering is not possible for all profiles when producing spline shaft profiles by the hobbing process.
2) These values have been calculated on the basis that the spline shaft profiles are produced by the hobbing process
3) Tolerances for inside diameter d1, outside diameter d2, and key width b should be stated
4) The old symbol should no longer be used for new construction and remains in force only for the transition period.